48 MGD Expansion
Rock Hill, SC, is constructing an upgrade at the City of Rock Hill Water Treatment Plant and the Raw Water Pump Station to increase the plant's water capacity.
Completion
75%
Cartersville WTP Renovation Projects
The Cartersville WTP Renovation Projects include the installation of an air scour, new underdrains, a new control system with wireless filter valves and a....
Completion
90%
Flat Creek WRF Upgrades
The following improvements were completed at the Flat Creek Water Reclamation Facility (WRF) to help optimize plant performance and improve reliability...

Completion
100%
Wahoo Creek WWTP Aeration System Improvements
This project included the upgrade and replacement of the existing aeration basin diffusers with more efficient diffusers, restoration of 2 older blowers, and installation of VFD’s...
Completion
100%
Wahoo Creek Influent & Diversion Pump Station
This project involved the construction of 2 new pump stations (Influent & Diversion Pump Stations) at the NU Wahoo Creek WWTP...
Completion
100%
Hershall B. Norred WTP 1980 HSPS Electrical Upgrades
This project (completed in 2014) included the complete replacement of the 5KV gear serving the two 600 HP (4160V) motors in the 1980 High-Service Pump Station (HSPS), and the replacement of a smaller 480V panel...
Completion
100%
2017 Linwood Reclamation Facility
To help eliminate “binding” of existing 2-mm bar screens, located downstream of the Influent Pump Station, a new 9-mm bar screen was installed upstream of the Influent Pump Station...
Completion
100%
2017 Newnan Utilities Mineral Springs WWTP Sludge Dewatering Upgrades
To comply with more stringent discharge limits required by the Georgia EPD as part of a planned treatment system expansion...
Completion
100%
2017 Newnan Utilities Mineral Springs WWTP Aeration System Upgrades
To help improve plant performance and reduce energy costs, the Mineral Springs WWTP Aeration System Project included...
Completion
100%
York County 30″ Raw Water Main Conversion
To help satisfy future water demands, York County converted an abandoned existing 30” ductile iron raw water main...
Completion
100%
Water System Master Plan Update
The Town of Fort Mill is one of the most rapidly growing cities in South Carolina. In response to this growth, W&S assisted the Town...
Completion
100%
US 221 Water Tank Rehab
To ensure the long-term protection of the US 221 elevated water tank, the interior and exterior coatings were rehabilitated.
Completion
100%
Unicoi WTP and Watauga WTP – Hypochlorite Storage
W&S assisted the City of Johnson City with the installation of bulk sodium hypochlorite disinfection facilities at
Completion
100%
Williston Water System Improvements
The Town of Williston completed system wide improvements to expand the capacity of their ground water system to comply with SCDHEC groundwater source capacity requirements
Completion
100%
Coosawattee River Resort – Water Line Replacement
The Ellijay-Gilmer County Water and Sewerage Authority received APRA funding to replace water lines in western Gilmer County that
Completion
100%
Manchester Creek Outfall Sewers
The Manchester Creek Outfall Sewers project spanned 4 phases of construction, and oversaw, in total, the installation of approximately 17,500 linear feet...
Completion
100%
Rubes Creek WRF – Headworks Facilities and Rotary Drum Screen Installation
The purpose of the Rubes Creek WRF project was to equip the plant with upgrades which would protect the downstream MBR facilities from potential damage and allow the successful operation of the WRF.
Completion
100%
City of Rock Hill WTP Expansion to 36 MGD
The City of Rock Hill completed multiple phases at the City of Rock Hill WTP to increase the plant capacity from 24 MGD to 36 MGD.
Completion
100%
Mill Creek WTP Rehabilitation
The improvements at the Mill Creek WTP were focused on the overhaul of the 14.4 MGD plant from a conventional filtration plant into a submerged membrane plant...
Laurel Street Water Line and Elevated Tank
W&S worked with the City of Rock Hill to complete a multi-phased project which replaced an aging 0.5 MG elevated water tank with a new larger 0.75 MG composite elevated water tank...